Projects Awarded in Q4 – 2020
04/02/2026-
110kV Becamex Substation and Connection Line
-
Investor: Southern Power Project Management Board – Branch of Southern Power Corporation
-
Address: 16 Au Co Street, Tan Son Nhi Ward, Tan Phu District, Ho Chi Minh City
-
Construction Duration: 210 days
-
Scope of Work: Supply, construction, and installation of substation and transmission line equipment and materials; installation of camera surveillance and fire protection systems; relay setting calculations; development of energization plan; commissioning and troubleshooting.
-
110kV Bao Loc 2 Substation and Connection Line
-
Investor: Southern Power Project Management Board – Branch of Southern Power Corporation
-
Address: 16 Au Co Street, Tan Son Nhi Ward, Tan Phu District, Ho Chi Minh City
-
Construction Duration: 210 days
-
Scope of Work: Supply and complete installation of substation equipment and materials, including relay setting calculations, energization plan development, commissioning and troubleshooting, camera surveillance system, and fire protection system.
-
110kV My Phuoc 3 Substation and Connection Line
-
Investor: Southern Power Project Management Board – Branch of Southern Power Corporation
-
Address: 16 Au Co Street, Tan Son Nhi Ward, Tan Phu District, Ho Chi Minh City
-
Construction Duration: 210 days
-
Scope of Work: Supply and complete installation of substation equipment and materials, including relay setting calculations, energization plan development, commissioning and troubleshooting, camera surveillance system, and fire protection system.