Newly Awarded Projects in Long Son - Vung Tau

04/02/2026
  1. Electrical Works – LSP A1 Package – Olefins Plant

  • Investor: LSP Co., Ltd. / Technip Joint Venture

  • Address: Long Son, Ba Ria – Vung Tau

  • Construction Period: 26 months

  • Scope of Work: Supply of materials, installation equipment, and cable inspection for the electrical package

  1. Electrical and Equipment Works – LSP C-PP Package

  • Investor: LSP Co., Ltd. / SAMSUNG Engineering

  • Address: Long Son, Ba Ria – Vung Tau

  • Construction Period: 22 months

  • Scope of Work: Supply of materials, installation execution, and cable inspection for the electrical and equipment package

  1. Temporary Construction Works – LSP A1 Package – Olefins Plant

  • Investor: LSP Co., Ltd. / Technip Joint Venture

  • Address: Long Son, Ba Ria – Vung Tau

  • Construction Period: 21 months

  • Scope of Work: Design, supply of materials, civil works construction, equipment installation, testing and commissioning for the TCF package