110kV LEGO Substation and Connecting Transmission Line
On June 2, 2023, Power Engineering Consulting and Construction Joint Stock Company No. 5 (PCC5) signed a construction contract for the package “Supply of Equipment, Materials, and Manpower for the Construction of the 110kV LEGO Substation and Connecting Transmission Line” with Power Construction Consulting Joint Stock Company 3 (PECC3).
Project Information:
-
Project Name: 110kV LEGO Substation and Connecting Transmission Line
-
Investor: LEGO Manufacturing Vietnam Co., Ltd.
-
Main Contractor: Power Construction Consulting Joint Stock Company 3 (PECC3)
-
Location: Vietnam – Singapore Industrial Park III (VSIP III)
-
Construction Duration: 160 days
-
Main Scope of Work: Supply of equipment, materials, and manpower for the construction of the 110kV LEGO Substation and its connecting transmission line.