Implementation of 110kV Underground Power Line Construction

Power Construction and Investment Consulting Joint Stock Company No. 5 has carried out the underground installation of 110kV transmission lines and above.

  • Installation of underground cables of 110kV and above

  • Construction of cable trenches

  • Supply of equipment and materials for the installation of underground cables of 110kV and above

  • Supply and installation of temporary poles and operation of temporary transmission lines

  • Inspection and testing of cables of 110kV and above

  • Restoration and reinstatement of the original condition of affected items

  • Provision of machinery and equipment for the installation of underground cables