Implementation of 110kV Underground Power Line Construction
Power Construction and Investment Consulting Joint Stock Company No. 5 has carried out the underground installation of 110kV transmission lines and above.
-
Installation of underground cables of 110kV and above
-
Construction of cable trenches
-
Supply of equipment and materials for the installation of underground cables of 110kV and above
-
Supply and installation of temporary poles and operation of temporary transmission lines
-
Inspection and testing of cables of 110kV and above
-
Restoration and reinstatement of the original condition of affected items
-
Provision of machinery and equipment for the installation of underground cables